Stoughton High School

Project Overview

Location: Stoughton, MA
Statistics:
  • Project Size: 214,000 sq. ft.
  • Total Construction Budget: $123mm
Products
Project Delivery Team:
  • Architect: Drummey, Rosane, Anderson, Inc.
  • Lab Planner: Tavares Design Associates
  • General Contractor: Bond Brothers
  • Dealer: Northeast Interior Systems, Inc.

Project Summary


The students of Stoughton High School are attending classes in this newly constructed facility featuring state-of-the-art STEAM labs/classrooms. CiF’s mobile tables provide classroom spaces that are easily configured to meet their evolving curriculum. A variety of products/materials (butcher block tops, stainless steel tops with extra large integral sinks) were incorporated into the project.