Engineering Research Center

Brown University

Project Summary

Brown University's Engineering Research Center stands as a testament to the efficiency of Integrated Project Delivery (IPD). By bringing NEIS into the collaborative team early, the project achieved completion three months ahead of schedule and within budget. This state-of-the-art, three-story facility, designed with 20 team-based lab modules, showcases the power of a truly integrated and efficient construction process.

Project OVERVIEW

Location

Providence, RI

Statistics

• Project Size: 80,000 sq. ft.
• Total Construction Budget: $88 mm

PRODUCTS

• CiF's S-Line Painted Metal Casework
• CiF's Tech Center Flexible Table
• CiF's Pinnacle Flexible Table
• CiF's Wing Service Distribution

PROJECT DELIVERY TEAM

• Architect: Kieran Timberlake
• Lab Planner: Research Facilities Design (RFD)
• Construction Manager: Shawmut Design and Construction
• Dealer: Northeast Interior Systems, Inc.