Catholic High School

Holy Cross 

Project Summary

Holy Cross Catholic High School redesigned four science classrooms to accommodate instructional teaching and student lab work. This functional layout has plenty of storage space surrounding the perimeter of the room to hold instruments and necessary equipment. Leaving the middle of the classrooms free for instructional teaching. The durable and chemical resistant wood casework solution was the best choice for Holy Cross. CiF fabricated the Tier 1 premium wood casework and the teacher instructional desks outfitted with utility chases underneath.

Project OVERVIEW

Location

WOODBRIDGE, ON

Statistics

• Project Size: 3,500 sq. ft.
• CiF Contract: $205,000

PRODUCTS

• CiF Premium E-Line White Maple Wood Casework
• CiF APEX air Fume Hoods
• Metal Grills
• Durcon Epoxy Work Surfaces

PROJECT DELIVERY TEAM

• Architect: CS&P Architects
• General Contractor: West Metro Contracting