YORK UNIVERSITY
Project Summary
This $1.3 million project required the development of teaching laboratories to meet the needs of 2,000 students plus faculty and staff, in a new 172,000 sq. ft. award winning design facility. While working with the architect on this new facility, CiF Lab Solutions was challenged to provide unique product solutions including curved, field-welded stainless steel work surfaces that were grounded into anti-static ESD plastic laminate casework to provide an electro-static free work surface.
Project OVERVIEW
Location
TORONTO, ON
Statistics
• Project Size: 30,000 sq. ft.
• CiF Contract: $1.3 million
PRODUCTS
• CiF Premium S-Line Painted Metal Casework
•CiF Ascent Flexible and Adaptable Lab Tables
• CiF APEX air Fume Hoods
PROJECT DELIVERY TEAM
• Architect: ZAS Architecture
•Laboratory Planner: ZAS Architects
•General Contractor: Laing O’Rourke & Gilliam
•Dealer: CiF Direct