Stoughton High School
Project Summary
The students of Stoughton High School are attending classes in this newly constructed facility featuring state-of-the-art STEAM labs/classrooms. CiF’s mobile tables provide classroom spaces that are easily configured to meet their evolving curriculum. A variety of products/materials (butcher block tops, stainless steel tops with extra large integral sinks) were incorporated into the project.
Project OVERVIEW
Location
STOUGHTON, MA
Statistics
• Project Size: 214,000 sq. ft.
• Total Construction Budget: $123mm
PRODUCTS
• CiF’s E-Line Wood Casework
• CiF’s Music Casework
• CiF’s Apex Air Fume Hoods
PROJECT DELIVERY TEAM
• Architect: Drummey, Rosane, Anderson, Inc.
• Lab Planner: Tavares Design Associates
• General Contractor: Bond Brothers
• Dealer: Northeast Interior Systems, Inc.